Mains PYQs
UPSC Mains Mechanical Engineering paper 1 2019 questions
- A 600 N cylinder is supported by the frame BCD as shown in the Figure 1(a). The frame is hinged at D. Determine the reactions at A, B, C and D.
[Figure]
Labels: frame 300 mm wide, 600 mm high; cylinder r = 150 mm touching the wall at A, the frame base at B and the frame side at C; hinge at D.
- Find the complementary shear stress for the element with stresses as shown in Figure 1(b) given below. The major principal stress is 120 MPa. What is the magnitude of maximum shear stress and minimum principal stress ? Also, locate the principal planes and maximum shear stress planes.
[Figure]
Labels: 120 MPa compressive on top and bottom faces, 80 MPa compressive on left and right faces, shear stress $\tau_{xy}$ on all four faces.
- What are the factors affecting critical cooling rate ?
- In a tensile test on a steel tube, outside diameter of 18 mm and inside diameter of 12 mm, an axial load of 12 kN produces a stretch of $3\cdot5375\times10^{-3}$ mm, on a length of 50 mm and a lateral contraction of outer diameter of $3\cdot18375\times10^{-4}$ mm. Calculate all the four elastic constants.
- The turning-moment diagram for a petrol engine is drawn to a vertical scale of 1 mm = 500 Nm and a horizontal scale of 1 mm = $3^\circ$. The turning-moment diagram repeats itself after every half revolution of the crank shaft. The areas above and below the mean torque line are + 270, − 590, + 100, − 390, + 870 and − 260 $\mathrm{mm^2}$. The rotating parts have a mass of 50 kg and radius of gyration of 2·2 m. If the engine speed is 1500 rpm, determine the coefficient of fluctuation of speed.
- For the single overhanging beam as shown in Figure 2(a), draw the Shearing Force and Bending Moment diagram, if $q \times 2L = 3P$. Also find the maximum Bending Moment and its location. Also locate the point of contraflexure.
[Figure]
Labels: beam ABC, u.d.l. q kN/m over AB (span 2L m), support at A (reaction $R_A$) and B (reaction $R_B$), overhang BC of L m with point load P kN at C.
- What is the value of P in the system as shown in Figure 2(b) to cause the motion to impend ? Assume the pulley smooth and coefficient of friction, $\mu = 0\cdot2$ between the other contact surfaces.
[Figure]
Labels: block B of 500 N on a horizontal surface pulled by force P at $30^\circ$ above horizontal; block A of 750 N on a $60^\circ$ inclined plane; connected over a pulley at the top.
- (i) A kinematic link may consist of many resistant bodies having no relative motion between them. Explain this statement considering the mechanism used in an internal combustion engine.
(ii) Explain, with the help of a neat sketch, the equivalent lower-pair mechanism of a cam-translating follower mechanism.
(iii) Some four-bar linkages are shown in Figure 2(c), where the number indicates the respective link length (in cm). Identify the nature of each mechanism i.e. whether it is
A. double crank,
B. crank-rocker, or
C. double rocker.
[Figure]
Labels: linkage A with links 20, 18, 16 and fixed link 10; linkage B with links 30, 20, 16 and fixed link 24; linkage C with links 10, 18, 16 and fixed link 20.
- For the beam as shown in Figure 3(a) given below, if P = 1 kN and L = 1 m, determine the deflection at overhanging end C. The beam is of rectangular cross-section 120 mm × 240 mm (depth) and coefficient of elasticity, E = 200 GPa.
Given : $q \times 2L = 3P$.
[Figure]
Labels: beam ABC with u.d.l. q = 1·5 kN/m over AB (2L = 2 m), reactions $R_A$ and $R_B$, overhang BC L = 1 m with P = 1 kN at C; rectangular cross-section 120 mm wide and 240 mm deep with X-axis through the centre.
- (i) What is normalizing ? State clearly its purpose, process and applications.
(ii) Compare normalizing and annealing processes.
- In an epicyclic gear train, gear A has 15 teeth and is rigidly fixed to the motor shaft. Gear B has 20 teeth and meshes with A and also with fixed wheel D which has 55 teeth. Gear C has 15 teeth and is integral with B. Gear C meshes with gear E which is keyed to the machine shaft. The gear E has 50 teeth. The arm rotates about the same axis on which A is mounted and carries the compound wheels B and C. Arrangement is shown in Figure 3(c) given below. If the motor runs at 1000 rpm, find the speed of the machine shaft.
[Figure]
- Two gear wheels having 20 and 40 teeth (involute) are in a mesh. Given :
Pressure angle = $22\cdot5^\circ$
Module = 12 mm
Determine the addendum for each gear wheel and the contact ratio if the line of contact on each side of the pitch point is half of the maximum possible length on that side.
- A thin cylindrical shell is 3 m long, 1 m in diameter, thickness of wall is 10 mm. The internal fluid pressure is $1\cdot5\ \mathrm{N/mm^2}$. Calculate the change in dimensions of the shell and hence change in its volume. Also calculate the maximum intensity of shear stress. Given : E = 200 GPa and $\nu = 0\cdot3$.
- A circular cylinder of mass 4 kg and radius 15 cm is connected by a spring of stiffness 4000 N/m as shown in Figure 4(c) given below. It is free to roll on a horizontal rough surface without slipping. Determine the natural frequency.
[Figure]
Labels: spring K attached from a wall to the centre of the cylinder of mass m; displacement X to the right.
- For an orthogonal cutting process, the following data is given :
Uncut chip thickness = 0·125 mm, Velocity = 110 m/min,
Rake angle = $12^\circ$, Width of cut = 6·25 mm, Chip thickness = 0·28 mm,
Cutting force = 550 N, Thrust force = 225 N
Calculate the percentage of total energy that goes into overcoming friction at the tool-chip interface.
- A cloth merchant has an average demand of 50 jeans per day with a standard deviation of 4 jeans per day. The average lead time of supply of jeans is 7 days and standard deviation of lead time is 2 days. Calculate the ROL (Reorder Level) with 95% service level. (Given Z at 95% = 1·65)
- (i) Differentiate the applications of control charts for variables and control charts for attributes.
(ii) Define the term Process Capability Index and show the range of values of capability index for process under control and out of control showing the relationship with specification limits and process spread.
- Write the effect of various machining parameters on Material Removal Rate (MRR) in the case of Ultrasonic Machining (USM).
- (i) Write the major components of TQM philosophy.
(ii) How do you incorporate the seasonal variations in demand forecasting ?
- An assembly line is to produce 180 units per 8-hour shift. The following table identifies the work elements, times, immediate predecessors :
| Work Element | Time (Seconds) | Immediate Predecessor(s) |
|---|---|---|
| A | 45 | None |
| B | 70 | A |
| C | 35 | D, E, F |
| D | 30 | B |
| E | 25 | B |
| F | 20 | B |
| G | 110 | A |
| H | 140 | G |
| I | 130 | H |
| J | 120 | C, I |
(i) Find the desired cycle time.
(ii) Find the theoretical minimum number of workstations required.
(iii) Draw the precedence diagram.
(iv) What are the efficiency and balance delays of the solution found ?
- A company has narrowed the search for a new facility location to four places A, B, C and D. The estimated fixed costs/annum and variable cost/unit at the locations are given in the table below :
| Location | Fixed costs per annum (in ₹) | Variable costs per unit (in ₹) |
|---|---|---|
| A | 9,00,000 | 300 |
| B | 15,00,000 | 150 |
| C | 25,00,000 | 125 |
| D | 30,00,000 | 110 |
(i) Plot the total cost curves for all the four locations on single graph. Identify on the graph the approximate range over which each location provides the lowest cost.
(ii) If the expected demand is 12,000 units per year, what is the best location ?
- Two tool materials, X and Y have been selected for the machining of a workpiece. The data obtained for both the materials are shown in the table given below :
| Tool materials | Tool life (minutes) | Cutting speed (metres/minute) |
|---|---|---|
| X | 25 | 100 |
| X | 10 | 150 |
| Y | 40 | 200 |
| Y | 20 | 250 |
Estimate the relative machinability, considering material X as standard material and tool life of 50 minutes as criteria.
- A tube of 18 mm outside diameter and 1·6 mm wall thickness is to be drawn to an outside diameter of 12 mm and wall thickness of 1 mm using a plug. Calculate the drawing load, given that coefficient of friction for die = 0·16 and for the plug = 0·2. The die angle is $30^\circ$ and the plug angle is $20^\circ$. The metal is in fully work hardened condition with a yield stress of 1·4 $\mathrm{kN/mm^2}$. Also find the power rating of the motor if the drawing speed is 0·6 m/sec.
- Under the orthogonal cutting operation of a workpiece of aluminum, the forces determined by the dynamometer $F_C$ and $F_T$ are 1500 N and 1000 N respectively. Rake angle of the tool is $10^\circ$. Chip thickness ratio is 0·37. Determine $F_N$, $F_S$, N and F using Merchant's theory. Also determine the coefficient of friction at the chip-tool interface.
(Here F is the force along the rake surface; N is the force acting perpendicular to the rake surface, $F_C$ is the cutting force; $F_T$ is the tangential force and perpendicular to $F_C$; $F_S$ is the shear force and $F_N$ is the normal component of shear force).
- Arrange the following jobs on Machine 1 to Machine 5 using the Johnson's rule of sequencing. The time (in minutes) required by the jobs on these machines are shown in the table given below. Also find the total idle time and completion time of the jobs.
| Jobs | Machine 1 | Machine 2 | Machine 3 | Machine 4 | Machine 5 |
|---|---|---|---|---|---|
| A | 7 | 5 | 2 | 3 | 9 |
| B | 6 | 6 | 4 | 5 | 10 |
| C | 5 | 4 | 5 | 6 | 8 |
| D | 8 | 3 | 3 | 2 | 5 |
- The voltage – length characteristics of a direct current arc is given by
$V = (22 + 40l)$ Volts,
where $l$ is the length of the arc in cm. The power source characteristic is approximated by a straight line with an open circuit voltage = 80 V and short circuit current = 1000 amp. Determine the optimum arc length and corresponding power.
- The time estimates in weeks for the activities of a PERT network are given in the table below :
| Activity | Optimistic time ($t_o$) | Most likely time ($t_m$) | Pessimistic time ($t_p$) |
|---|---|---|---|
| 1 – 2 | 1 | 1 | 7 |
| 1 – 3 | 2 | 5 | 8 |
| 1 – 4 | 2 | 2 | 8 |
| 3 – 5 | 3 | 6 | 15 |
| 4 – 5 | 1 | 4 | 7 |
| 5 – 6 | 2 | 5 | 14 |
| 2 – 6 | 2 | 5 | 8 |
(i) Draw network diagram and determine project completion time.
(ii) Find the probability that the project will be finished in between 15th to 20th week of the scheduled completion.
(iii) Find the probability that the project will be finished no more than 2 weeks later than the expected completion time.
(The standard normal distribution chart is given in the question)
- A hole and shaft have a basic size of 25 mm and are to have a clearance fit with maximum clearance of 0·02 mm and a minimum clearance of 0·01 mm. The hole tolerance is to be 1·5 times of the shaft tolerance. Determine the limits for both hole and shaft (i) using hole basis system and (ii) using shaft basis system.