UPSC Mains Mechanical Engineering paper 1 2016 questions
- Find the moment of inertia of the shaded area shown in the figure, about the edge AB.
[Figure] Rectangle ABDC, 10 cm wide and 20 cm high, with a semicircle of R = 5 cm cut out at the top edge CD; the rest is shaded.
- A bar of steel is 50 mm in diameter and 600 mm long. A tensile load of 150 kN is found to stretch the bar by 0.23 mm. The same bar, when subjected to a torque of 1.4 kN-m is found to twist through $1^\circ$. Find the values of the four elastic constants.
- An effort of 250 N is required just to move a certain body up an inclined plane of angle $20^\circ$, the force acting parallel to the plane. If the angle of inclination of the plane is made $25^\circ$, the effort, required again, applied parallel to the plane, is found to be 280 N. Find the weight of the body and coefficient of friction.
- Write the composition of low, medium and high carbon steels and their applications.
- A compound gear train comprising the input shaft driven by a motor at 1425 rpm in clockwise direction is shown in the figure. The arrangement and the number of teeth on the gears is shown in the figure. Determine the speed of the output shaft and the direction of rotation of the output shaft.
[Figure] Gears 1 to 6 with $T_1 = 30$, $T_2 = 75$, $T_3 = 40$, $T_4 = 120$, $T_5 = 28$, $T_6 = 70$.
- The equation of motion of a particle is given, acceleration 'a' in terms of time 't' as below :
$a = 3t^2 + 2t + 4$
in which acceleration 'a' is in $\mathrm{m/s^2}$ and time 't' is in seconds. It is observed that the velocity of the particle is 10 m/s after 4 seconds; and the displacement of the particle is 6 m after 3 seconds. Determine :
(i) Velocity after 6 seconds
(ii) Displacement after 5 seconds
- The S.F. diagram of a beam with overhangs is shown in the figure. Determine the loading on the beam and draw the B.M. diagram.
[Figure] Shear force diagram over spans of 3 m, 5 m and 2 m: constant -1 kN over the first 3 m, then positive 5 at the start of the 5 m span falling linearly through zero to -5 at its end, then constant +2 kN over the last 2 m (labels: 1 kN, 1, 5, 5, 2, 2 kN).
- What is critical cooling rate in heat treatment of steels ? Write about the significance of critical cooling using TTT diagram. What are the factors affecting critical cooling rate ?
- At a point in a material, the stresses on two mutually perpendicular planes are 60 $\mathrm{N/mm^2}$ (tensile) and 40 $\mathrm{N/mm^2}$ (tensile). The shear stress across these planes is 15 $\mathrm{N/mm^2}$. Find the magnitude and direction of the resultant stress on a plane making an angle of $40^\circ$ with the plane of the first stress. Also find the normal and tangential stresses on this plane.
- The simply supported beam AB carries a uniformly distributed load 'w' per unit length (figure). Determine the equation of the elastic curve and the maximum deflection of the beam.
[Figure] Simply supported beam AB of span L with uniformly distributed load w.
- Determine the whirling speed of a shaft, 25 mm diameter and 800 mm long, with a mass of 1 kg placed at mid span, simply supported at the ends. The density of the shaft material is 50 $\mathrm{g/cm^3}$ and Young's modulus of elasticity is $2 \times 10^{11}\,\mathrm{N/m^2}$.
[Figure] Shaft simply supported at the ends, length 800 mm, with a 1 kg mass at mid span.
- What size of shaft should be used for the rotor of a 3.5 kW motor operating at 3600 rpm, if the shearing stress is not to exceed 58 MPa in the shaft ?
- How do the following additives change the properties of polymers :
(i) Fillers
(ii) Plasticizers
(iii) Colourant
(iv) Lubricant
- The turning moment diagram of a multi-cylinder reciprocating engine is drawn to scale :
1 mm = 500 N-m, Y-axis and 1 mm = $4^\circ$, X-axis.
The areas above and below the mean torque line are :
$+50, -120, +95, -140, +90, -70$ and $+95\,\mathrm{mm^2}$,
when the engine is running at 1000 rpm. If the mean fluctuation of speed is not to exceed $\pm 1\%$ of the mean speed, determine the mass of the flywheel of radius of gyration of 400 mm.
- A 110 kg machine is mounted on an elastic foundation of stiffness $2 \times 10^6$ N/m. When operating at 150 rad/s, the machine is subject to a harmonic force of magnitude 1500 N. The steady-state amplitude of the machine is measured as 1.9 mm. What is the damping ratio of the foundation ?
- Draw and label the geometry of a single point cutting tool. Write a typical tool signature for a single point cutting tool along with the information which can be obtained from a tool signature.
- Differentiate between Tolerance and Allowance.
- (i) Define 'Standard time'.
(ii) How is the observed time converted to standard time ? List the admissible allowances.
- (i) List the basic concepts of TQM.
(ii) List any five conventional QC tools.
- (i) State the basic principles of lean production.
(ii) Compare lean production with mass production.
- Calculate the current required for electrochemical machining of pure iron so as to achieve a metal removal rate of $800\,\mathrm{mm^3/min}$.
Consider :
Faraday's constant (F) = 96,500 Coulombs
Atomic weight of iron = 56
Valency of iron = 2
Density of iron = $7.8\,\mathrm{g/cm^3}$
- (i) What is REL chart ? Name closeness ratings.
(ii) The layout of a plant consisting of six departments A, B, C, D, E and F is shown below. All departments are of the same size and configuration. The material handling cost per length travel between the departments is same. The handling frequencies between the departments are given in the table :
Layout
| A | C | E |
| --- | --- | --- |
| B | D | F |
Handling Frequencies
| From \ To | A | B | C | D | E | F |
| --- | --- | --- | --- | --- | --- | --- |
| A | - | 0 | 90 | 160 | 50 | 0 |
| B | - | - | 70 | 0 | 100 | 130 |
| C | - | - | - | 20 | 0 | 0 |
| D | - | - | - | - | 180 | 10 |
| E | - | - | - | - | - | 40 |
| F | - | - | - | - | - | - |
Taking the distance as a unit for the departments that share boundaries with the adjacent one, should the departments C and F be interchanged in location ? Justify your answer.
- (i) What statistical assumptions are made in PERT ? If a particular activity has a very high variance in PERT chart, how will this affect the completion time ?
(ii) A list of activities, precedence relations, and optimistic ($T_o$), most likely ($T_m$) and pessimistic ($T_p$) activity completion times for a secret military project are given below :
| Activity Name | Predecessor Activity | $T_o$ | $T_m$ | $T_p$ |
| --- | --- | --- | --- | --- |
| A | - | 4 | 5 | 6 |
| B | A | 3 | 4 | 8 |
| C | B | 1 | 2 | 3 |
| D | A, C | 3 | 6 | 8 |
| E | D | 7 | 8 | 9 |
| F | E | 4 | 5 | 7 |
| G | C | 3 | 4 | 5 |
| H | D, E, G, I | 12 | 13 | 15 |
| I | C | 1 | 2 | 4 |
| J | G, H | 1 | 1 | 1 |
| K | F, H, J | 1 | 6 | 7 |
Draw the activity network diagram for this project. What is the critical path for the project ? What is the probability that the project will be completed (1) in 45 days, and (2) in 50 days ?
[ The areas under the standard normal probability distribution is attached ]
- For an orthogonal turning process, calculate the shear force and kinetic coefficient of friction at chip-tool interface using the following data :
Chip thickness ($t_c$) = 0.4 mm
Width of cut (b) = 2.5 mm
Feed rate (f) = 0.2 mm/rev
Tangential cutting force ($F_c$) = 1100 N
Thrust force ($F_t$) = 290 N
Cutting speed = 2.5 m/sec
Rake angle = $+10^\circ$
- A company is planning to manufacture medical testing equipment. Three locations A, B and C are under consideration. The estimated fixed costs/annum and variable cost/unit at the locations are given in the table below :
| Location | A | B | C |
| --- | --- | --- | --- |
| Fixed cost/Annum (in Lakh ₹) | 300 | 500 | 250 |
| Variable cost/unit (in ₹) | 3000 | 2000 | 3500 |
The average sale price of the equipment may be taken to be ₹ 7,000 per unit.
(i) If the projected sales volume is 18000 units per year, which location should be chosen ?
(ii) How much will be the profit per year ?
- The following table shows the averages ($\overline{X}$) and ranges (R) of the spindle diameters in mm for 30 sub-groups of 5 items each taken from a production line chronologically :
| Sub-group | $\overline{X}$ | R | Sub-group | $\overline{X}$ | R | Sub-group | $\overline{X}$ | R |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| 1 | 45.020 | 0.375 | 11 | 45.600 | 0.275 | 21 | 45.260 | 0.150 |
| 2 | 44.950 | 0.450 | 12 | 45.020 | 0.175 | 22 | 45.650 | 0.200 |
| 3 | 45.480 | 0.450 | 13 | 45.320 | 0.200 | 23 | 45.620 | 0.400 |
| 4 | 45.320 | 0.150 | 14 | 45.560 | 0.425 | 24 | 45.480 | 0.225 |
| 5 | 45.280 | 0.200 | 15 | 45.140 | 0.250 | 25 | 45.380 | 0.125 |
| 6 | 45.820 | 0.250 | 16 | 45.620 | 0.375 | 26 | 45.660 | 0.350 |
| 7 | 45.580 | 0.275 | 17 | 45.800 | 0.475 | 27 | 45.460 | 0.225 |
| 8 | 45.400 | 0.475 | 18 | 45.500 | 0.200 | 28 | 45.640 | 0.375 |
| 9 | 45.600 | 0.475 | 19 | 45.780 | 0.275 | 29 | 45.390 | 0.650 |
| 10 | 45.680 | 0.275 | 20 | 45.640 | 0.225 | 30 | 45.290 | 0.350 |
Construct $\overline{X}$ and R-charts on the basis of the first 20 sub-groups. Check if the process continues under control for the remaining sub-groups (i.e., 21 to 30). What do you conclude ? Find the process capability.
The value of $d_2$ for a sample of 5 is 2.326.
- The volume of a weld nugget produced by spot welding process is $80\,\mathrm{mm^3}$. Welding is performed using 10000 A current. Energy required for melting of unit volume of metal is $10\,\mathrm{J/mm^3}$. Assume that heat lost to the surrounding base metal is 500 J and contact resistance is 0.0002 ohms.
Calculate the (i) time (in sec) for which the welding current is supplied, and (ii) thermal efficiency of the spot welding process if other heat losses are negligible.
- A company manufacturing washing machines establishes a relationship between the sale of washing machines and the population of the city. The market research carried out reveals the following information :
| Population of the city (in lakhs) | 5 | 7 | 15 | 22 | 27 | 36 |
| --- | --- | --- | --- | --- | --- | --- |
| No. of washing machines demanded (unit in hundreds) | 28 | 40 | 65 | 80 | 96 | 130 |
Fit a linear regression equation and estimate the demand of washing machines for a city of population of 45 lakhs.
- A contractor has a requirement of cement that amounts to 1500 bags per day. No shortages are allowed. Cement costs ₹ 400 per bag. Holding costs are ₹ 0.2 per bag per day and the ordering process cost per order is ₹ 150.
(i) Find the optimal lot size and the system cost per day.
(ii) If, however, the price per bag is quoted in accordance with the following schedule :
| Purchase Quantity (Bags) | Price/Bag (₹) |
| --- | --- |
| 0 - 1999 | 400 |
| 2000 and above | 395 |
Should the contractor take advantage of the quantity discount ?