- Describe various defects in clay bricks giving sources/causes of defects.
- Draw neat sketches, showing complete details of plans of alternate courses of a $1\frac{1}{2}$ brick thick masonry wall in English Bond having a right-angled corner.
- Describe the important features of Type 1, Type 2 and Type 3 preservatives used for timber.
- A ship is 55 km away from a lighthouse of height 62 m above mean sea level. An observer standing on the deck of the ship tries to see the lighthouse top. The height of the observer's eye above mean sea level is 10 m. Determine whether the lighthouse top will be visible to the observer or not. If not visible, find out the distance by which the ship has to travel towards the lighthouse so that it becomes visible to the observer.
- An alert driver with a reaction time of 0.75 seconds is driving downhill on a 2.5% grade at 60 kmph on a dry pavement when suddenly a person comes in the path of the driver at a distance of 55 m.
Can the driver stop in time with emergency braking ? Can the driver stop in time when it is a rainy day ?
Assume : g = 9.8 m/s$^2$
f = 0.4 (dry pavement)
f = 0.32 (wet pavement)
- The network for a construction project is shown in the figure given below. The three time estimates for each activity are given along each activity arrow. Determine the :
(i) Expected time of completion of each activity
(ii) Earliest expected time for each event
(iii) Latest allowable occurrence time for each event, (take earliest expected time for last event as the scheduled completion time for the project)
(iv) Slack for each event
(v) Critical path of the network
Also, give explanation of dotted arrow shown in the network. What is the significance of critical path ? All time estimates are in days.
[Figure] Network of events 1 to 7 with activity arrows labelled (optimistic - most likely - pessimistic): 1-2: 4-7-16; 1-3: 4-8-18; 1-4: 6-9-18; 2-6: 3-6-15; 2-3: dotted (dummy) arrow; 3-5: 4-7-16; 4-5: 5-9-19; 4-7: 6-10-20; 5-6: 2-6-10; 5-7: 8-11-20; 6-7: 3-5-13.
- What are the functions of tie bars in rigid pavements ? A cement concrete pavement has a thickness of 30 cm and lane width 3.75 m. Design the tie bars along the longitudinal joints using the data given below :
Allowable working stress in steel tie bars = 1250 kg/cm$^2$
Allowable tensile stress in deformed bars ($S_s$) = 2000 kg/cm$^2$
Allowable bond stress in plain bars ($S_b$) = 17.5 kg/cm$^2$
Allowable bond stress in deformed bars ($S_b$) = 24.6 kg/cm$^2$
Unit weight of concrete pavement (W) = 2400 kg/m$^3$
Maximum value of friction coefficient (f) = 1.35
- A high speed B.G. section with a maximum sanctioned speed of 130 kmph is proposed. The section is passing through a transition length with a 2° curve. Calculate the superelevation, maximum permissible speed and transition length for this section at curve. Assume the equilibrium speed as 90 kmph and the booked speed of the goods train to be 60 kmph. Rate of change of Cant or Cant deficiency is 35 mm/sec. Assume any other data suitably.
- Explain spot speed, running speed, space-mean speed, time-mean speed and average speed. [10]
The consolidated data collected from speed and delay studies by floating car method on a stretch of urban road of length 2.5 km, running East-West are given below in the table. Determine the average values of volume, journey speed and running speed of the traffic stream, along either direction. [10]
Mean Values of Speed and Delay
| Direction | Mean Journey Time (Minutes) | Mean Stopped Delay (Minutes) | Overtaking | Overtaken | In Opposite Direction |
|---|---|---|---|---|---|
| East-West | 4.85 | 1.60 | 4.5 | 6.5 | 376 |
| West-East | 8.36 | 1.90 | 4.0 | 5.5 | 280 |
(the last three columns are under the heading Number of Vehicles (Mean Value))
- Two points A and B having elevations of 585 m and 250 m respectively, above datum, appear on a vertical photograph obtained with a camera of focal length of 250 mm and flying altitude of 2300 m above datum. Their correlated photographic coordinates are as follows :
| Point | x (cm) | y (cm) |
|---|---|---|
| A | + 5.65 | + 3.75 |
| B | – 3.45 | + 8.55 |
Determine the ground coordinates of points A and B and calculate the horizontal distance between points A and B. [5]
The lengths, latitudes and departures of a closed traverse ABCD are as follows :
| Line | Length (m) | Latitude | Departure |
|---|---|---|---|
| AB | 350.8 | + 303.03 | + 176.6 |
| BC | 408.5 | – 336.7 | + 231.4 |
| CD | 285.4 | – 211.3 | – 191.9 |
Calculate the length and bearing of the line DA. [10]
- For what specific operations are the following equipment used at construction sites ?
(i) Sheep foot roller
(ii) Bulldozer
(iii) Dragline excavator
(iv) Tower crane
(v) Hoe
- The network of a certain project is shown in the figure given below with the estimated time duration (in days) of various activities. Determine the following :
(i) Earliest event time
(ii) Latest event time
(iii) Earliest start and finish time of each activity
(iv) Latest start and finish time of each activity
(v) Total float of each activity
(vi) Critical path of the network
(Assume the scheduled completion time of the project equal to the earliest event time of the last event)
[Figure] Network of events 1 to 8 with activity durations: 1-2: t=6; 1-3: t=8; 2-5: t=7; 3-4: t=7; 3-6: t=10; 4-5: t=6; 4-7: t=9; 5-7: t=8; 6-7: t=9; 7-8: t=6.
- Prepare a detailed analysis of rate (₹ per sq. m) for a 25 mm thick cement concrete (1 : 2 : 4) floor with cement finishing coat.
- Sketch a typical diamond crossing and label all its components. Design a diamond crossing between two B.G. tracks crossing each other at an angle of 1 in 8.5.
- What is a flood hydrograph ? The monthly discharge (Q) data of a river at a gauging station are given below :
| Month | Q (m$^3$/s) |
|---|---|
| January | 30 |
| February | 40 |
| March | 50 |
| April | 60 |
| May | 80 |
| June | 90 |
| July | 100 |
| August | 120 |
| September | 110 |
| October | 90 |
| November | 80 |
| December | 70 |
Draw the hydrograph and using the graph find peak flow and minimum flow in the river.
- Explain the following terms :
(i) Evaporation
(ii) Transpiration
(iii) Evapotranspiration
(iv) Infiltration
- A catchment has five raingauge stations. In a year, the annual rainfall recorded by the raingauges are 72.3 cm, 86.4 cm, 94.2 cm, 103.8 cm and 71.4 cm respectively. For a 5% error in the estimation of mean rainfall, find the additional number of raingauges needed.
- A high strength wastewater having an ultimate CBOD of 1000 mg/L is discharged to a river at a rate of 2 m$^3$/s. The river has an upstream ultimate CBOD of 10 mg/L and is flowing at a rate of 8 m$^3$/s. Assuming a reaction rate coefficient of 0.1/day, calculate the ultimate CBOD and 5-day CBOD of the river water just after the mixing point of the wastewater (at 0 km) and 20 km downstream from the mixing point. (Assume the velocity of river = 10 km/day)
- What do you understand by 'per capita demand' of water ? How is it determined ?
If average daily water demand is 135 litres per capita per day, determine the following :
(i) Maximum daily demand of water;
(ii) Maximum weekly demand of water;
(iii) Maximum monthly demand of water;
(iv) Maximum hourly demand of water.
- Explain an aquifer. Deduce the expression for discharge (Q) through a well in an unconfined aquifer taking usual symbols.
If the permeability of the aquifer, K = $10^{-4}$ m/s, radius of drawdown curve, R = 500 m, radius of well, r = 5.0 m, total aquifer thickness, H = 30 m and depth of water in well, h = 10 m, find the steady discharge.
- Determine the size (i.e., diameter and depth) of a circular rapid mixing tank having a mechanical mixer, which is to be designed for treatment of water flow of $10 \times 10^6$ litres per day and for mean hydraulic detention time of 45 seconds. Also, calculate the power required to achieve a mixing intensity (G) of 450 $\mathrm{s^{-1}}$.
Assume viscosity of water = $0.89 \times 10^{-3}$ N.s/m$^2$ and depth of water to diameter of tank ratio of 2 : 1.
- What is the "5 R's" concept in waste management ? How do they contribute to managing the ill-effects of waste ? Briefly explain. [7]
A dumpsite fire emits 4 g/s of $\mathrm{NO_x}$. Write an equation of $\mathrm{NO_x}$ concentration at 2.0 km downwind from the dumpsite if the wind speed $U_{10}$ = 5 m/s and its stability is 'D' type. What would be the maximum $\mathrm{NO_x}$ concentration at 2.0 km from the dumpsite at the ground and also at 50 m above ground ? Assume diffusion coefficients $\sigma_y$ = 150 m and $\sigma_z$ = 50 m at the downwind distance of 2.0 km from the source for 'D' type stability. [8]
- A sewer having a 60 cm diameter (D) is required to flow at 0.4 depth (i.e., a proportional depth d/D = 0.4) on a grade ensuring a degree of self-cleansing equivalent to that obtained at full depth at a velocity of 80 cm/s.
Determine the required grade, associated velocities and discharges at full depth and 0.4 depth. The value of Manning's rugosity coefficient (N) = 0.015 may be taken same at all depths of flow.
- Explain the following :
(i) Aquitard
(ii) Specific retention
(iii) Storage coefficient
(iv) Coefficient of permeability
(v) Darcy's Law
- For the gravity dam shown in the following figure, determine
I. Factor of safety against sliding
II. Factor of safety against overturning
[Figure] Gravity dam: top width 6 m; water level 3 m below the top; total height 27 m; downstream face starts 10 m below the top with slope 0.75 : 1.0, 20 m high, base 6 m + 15 m to the toe; weights W$_1$ and W$_2$.
Take the following data :
$\mu$ = 0.70, $\gamma_c$ = 24 kN/m$^3$
$\gamma_w$ = 10 kN/m$^3$
q = 1400 kN/m$^2$ [8]
Explain duty and delta. What is the discharge capacity required of the outlet to irrigate 2200 ha of sugarcane having a Kor depth of 17 cm and a Kor period of 30 days ? [7]
- What is Lacey's Silt Factor ? What is its value for standard silt ? Design an earthen canal using Lacey's silt theory with the following data :
Full supply discharge, Q = 15 m$^3$/s
Lacey's silt factor, f = 1.0
Canal side-slope = $\frac{1}{2}$ H : 1 V [10]
What are spillways ? Which type of spillways are provided in the following dams ?
(i) Bhakra-Nangal Dam
(ii) Ramganga (Kalagarh) Dam
(iii) Hirakud Dam
(iv) Rihand Dam
What forces act on a mass-concrete dam ? Explain any two of these forces in detail. [10]
- Determine the dimensions of a rectangular septic tank serving 100 persons in a hostel. The dimensions of the septic tank must be able to accommodate sedimentation, sludge digestion and sludge storage functionalities. The peak discharge of sewage can be considered as 240 litres per minute.
Use the following data :
Surface area required for every 10 litres per minute of peak flow = 0.92 m$^2$
Water depth required in the sedimentation tank = 0.3 m
Freeboard required = 0.3 m
Capacity required for sludge digestion process = 0.032 m$^3$/capita
Capacity required for digested sludge = 0.0002 m$^3$/capita/day
Sludge withdrawal (cleaning) frequency = once in a year
Length to width of tank ratio (L/B) = 2.5
- Uniform sand is used as a filter medium to treat the water. The sand grains are 0.6 mm in diameter with a shape factor ($\phi$) of 0.85 and specific gravity (G) of 2.67. The bed is 0.65 m deep with a porosity ($\eta$) of 0.45. The filter medium is to be expanded to a porosity ($\eta_e$) of 0.75 by hydraulic backwash. Determine the required backwash velocity, resulting expanded depth and loss through the expanded medium.
Assume the following data for use :
g = 9.81 m/s$^2$
Density of water ($\rho$) = 998.2 kg/m$^3$
Viscosity of water ($\mu$) = $1.002 \times 10^{-3}$ N.s/m$^2$