- What do you understand by percent swell and load factor? How is the load factor related to swelling of the material? How does it affect the transporting of material?
- A shop building gets an annual rate of return of ₹ 35,000. The future life of the building is estimated as 12 years. But if recommended repairs are carried out immediately at an estimated cost of ₹ 3,00,000, it is expected that the building will last for 30 years more.
Assuming the rate of interest as 8%, determine whether it is economical to carry out the recommended repairs or leave as it is. Justify your answer.
- What is normal tension? Determine the normal tension for a steel tape supported between two supports 10 m apart if the standard tension is 65 N and the weight of the tape per metre is 0.62 N. Take $E = 200\,\mathrm{GPa}$ and the area of cross-section as $8\,\mathrm{mm^2}$.
- What is rotary intersection? Sketch rotary showing its various elements. What are the guidelines for selecting a rotary type of intersection?
- If an $8^\circ$ curve track diverges from a main curve of $5^\circ$ in an opposite direction in the layout of a BG yard, calculate the superelevation and the speed on the branch line if the maximum speed permitted on the main line is 45 km/hr.
- The table given below shows a project's activities along with starting and finishing time and the budgeted cost. The conditions of contract allow measurements to be made monthly and payment of the amount certified less 5% retention to be paid to the contractor after a month of submission of bills. The first bill will be submitted after a month and subsequently every month. The retention amount is to be released after 6 months of completion of the project. The annual interest rate is 15% on locked-up capital. Calculate the total profit of the contractor if he earns 10% profit on the quoted cost :
| Activity | Starting (month) | Duration (month) | Cost/month (lakh rupees) |
|---|---|---|---|
| A | 0 | 2 | 4.5 |
| B | 1 | 3 | 4 |
| C | 3 | 1.5 | 12 |
| D | 3 | 1 | 15 |
| E | 3.5 | 1.5 | 4 |
| F | 5 | 1 | 20 |
All activities are independent.
- A two-lane pavement (7 m) on a National Highway in hilly terrain (snow-bound) has a curve of radius 60 m. The design speed is 40 km/hr. Determine the length of the transition curve. Determine the total length of the curve and the tangent length if the deflection angle is $60^\circ$. Assume $e = 0.07$; the rate of attainment of superelevation = 1 in 60; $C = \frac{80}{75+V}$, subject to maximum of 0.8 and a minimum of 0.5; rotation of superelevation about pavement centreline.
- The following consecutive readings were taken with a dumpy level and a 4 m levelling staff on continuously sloping ground at 30 m intervals :
0.680, 1.455, 1.855, 2.330, 2.885, 3.380, 1.055
1.860, 2.265, 3.540, 0.835, 0.945, 1.530, 2.250
The RL of the starting point was 80.750 m.
(i) Rule out a page of level book and enter the above readings.
(ii) Carry out reductions of heights by collimation method.
(iii) Determine the gradient of line joining the first and last point. Apply arithmetic check.
- Enumerate various types of track junctions. Calculate all the elements required to set out a 1 in 12 turnout taking off from a straight BG track with its curve starting from the toe of the switch, i.e., tangential to the gauge face of the outer main rail and passes through theoretical nose of crossing (TNC). The heel divergence is given as 11.4 cm.
- Enumerate the methods of adjustments of a closed traverse. A straight line AC of length 2000 m is required to be set out at right angle to a given line AB. This is done by traversing from A towards C. The observations are as follows :
| Line | Length (m) | Bearing |
|---|---|---|
| AB | - | 360°00′00″ |
| AD | 731 | 113°48′00″ |
| DE | 467 | 81°18′00″ |
| EF | 583 | 105°57′00″ |
Compute the necessary length and bearing of FC.
- Specify the laboratory tests conducted on cement. Also indicate the permissible values of the cement for corresponding tests (for ordinary Portland cement).
- What are different types of joints in rigid pavements?
Design a dowel bar system for a cement concrete slab for the following conditions :
Design wheel load = 4100 kg
Design load transfer = 40%
Slab thickness = 20 cm
Joint width = 2 cm
Permissible flexural stress in dowel bar = $1400\,\mathrm{kg/cm^2}$
Permissible shear stress in dowel bar = $1000\,\mathrm{kg/cm^2}$
Permissible bearing stress in concrete = $100\,\mathrm{kg/cm^2}$
$K$ value of subgrade = $8\,\mathrm{kg/cm^3}$
$E = 3\times10^5\,\mathrm{kg/cm^2}$
$\mu = 0.15$
- Find out the steepest gradient on a straight track using the following data for a train having 20 wagons :
Weight of each wagon = 18 tonnes
Rolling resistance of wagon = 2.5 kg/tonne
Speed of the train = 50 km/hr
Weight of locomotive with tender = 120 tonnes
Tractive effort of locomotive = 12 tonnes
Rolling resistance of locomotive = 3.5 kg/tonne
- (i) What do you understand by the orientation of the building? What factors will you consider with respect to building orientation? Justify with an example if you have to decide the orientation in cold climate zone. Will it be different in India and Australia for same season? [10]
(ii) List the different defects in timber. [5]
- Give five main human actions that affect the hydrological cycle and identify the components affected by each of these.
- Determine the yield from a tube well of 200 mm radius penetrating in an unconfined aquifer of depth 18 m. The depth of water in the well, after drawdown, is 12 m. The permeability of soil is 25 m/day and the radius of the circle of influence is 250 m.
- A watercourse has culturable commanded area of 2600 hectares, out of which the intensities of irrigation for perennial sugarcane and rice crops are 20% and 40%, respectively. The duties for these crops at the head of watercourse are 750 hectares/cumec and 1800 hectares/cumec, respectively. Find the discharge required at the head of watercourse if the peak demand is 120% of the average requirement.
- During BOD test conducted on a 5% dilution of waste, the following observations were taken :
DO of aerated water used for dilution = 3.6 mg/L
DO of original sample = 0.8 mg/L
DO of diluted sample after 5 days' incubation = 0.7 mg/L
Compute :
(i) 5 days' BOD
(ii) Ultimate BOD
Assume deoxygenation constant at test temperature as 0.12.
- Find the dimensions of a rectangular sedimentation tank for the following data :
Volume of water to be treated = 3 million litres per day
Detention period = 4 hours
Velocity of flow = 10 cm/min
- To compute the discharge in a small stream by velocity-area method, the stream width was divided into seven segments of 1.5 m width each. The average depths and the velocities measured in the segments by current meter are given in the table below. Compute the discharge in the stream :
| Segment No. | Average depth, d (m) | Velocity (m/s) at 0.2d | Velocity (m/s) at 0.6d | Velocity (m/s) at 0.8d |
|---|---|---|---|---|
| 1 | 0.4 | | 0.4 | |
| 2 | 0.7 | 0.76 | | 0.70 |
| 3 | 1.2 | 1.13 | | 1.19 |
| 4 | 1.4 | 1.25 | | 1.29 |
| 5 | 1.1 | 1.09 | | 1.13 |
| 6 | 0.8 | 0.69 | | 0.65 |
| 7 | 0.45 | | 0.42 | |
- What are the main factors that affect the selection of type of dam?
- A $100\,\mathrm{km^2}$ catchment has a 4-hour concentration time with 1-hour intervals, resulting in a time-area histogram as shown below :
[Figure]
Time-area histogram: area (km²) against time (hr); bars of 10, 20, 30 and 40 km² over the first four hours (as labelled in the figure: 10, 30, 20, 40).
A 6-hour storm has the following effective rainfall hyetograph ordinates :
| Time (hr) | 0-1 | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 |
|---|---|---|---|---|---|---|
| Effective rainfall (mm/hr) | 5 | 10 | 20 | 15 | 10 | 5 |
Use the time-area method to calculate the outflow hydrograph for this catchment.
- Design a trapezoidal alluvial channel using Kennedy's theory. The channel carries a discharge of $30\,\mathrm{m^3/s}$ with critical velocity ratio 1.0 and Manning's roughness coefficient $n$ equal to 0.0225. Assume that the bed slope is equal to 1 in 5000 and the trapezoidal channel has side slope of 1 H : 2 V.
- The rainfall of magnitude 40 mm and 30 mm occurring on two consecutive 4-hour durations on a catchment area of $30\,\mathrm{km^2}$ produced the following hydrograph of the flow at the outlet of the catchment :
| Time from start of rainfall (hr) | -12 | 0 | 12 | 24 | 36 | 48 | 60 | 72 | 90 | 108 |
|---|---|---|---|---|---|---|---|---|---|---|
| Observed flow ($\mathrm{m^3/s}$) | 7 | 5 | 15 | 27 | 22 | 17 | 13 | 9 | 5 | 5 |
Assuming a constant base flow $5\,\mathrm{m^3/s}$, determine the rainfall excess and $\phi$-index.
- Determine the aeration period, food to microorganism (F/M) ratio (in kg BOD/day/kg MLSS), percentage (%) efficiency of BOD removal and sludge age (in days) for the given operating data for conventional sludge treatment plant :
Wastewater flow = $45000\,\mathrm{m^3/day}$
Volume of aeration tank = $15000\,\mathrm{m^3}$
Influent BOD = 250 ppm
Effluent BOD = 25 ppm
Mixed liquor suspended solids (MLSS) = 2500 mg/L
Suspended solids in effluent = 50 mg/L
Suspended solids in waste sludge = 11000 mg/L
Quantity of waste sludge = $220\,\mathrm{m^3/day}$
- Water has to be supplied to a town with one lakh population at the rate of 150 litres/capita/day from a river 2000 m away. The difference in elevation between the lowest water level in the sump and reservoir is 36 m. If the demand has to be supplied in 8 hours, determine the size of main pipe and horsepower (BHP) of the pumps required. Assume the maximum demand as 1.5 times the average demand. Assume coefficient of friction, $f = 0.03$, velocity in the pipe 2.4 m/s and efficiency of pump 80%.
- With the aid of neat sketches, describe how a flow-mass curve could be used for the determination of the following :
(i) Minimum storage needed to meet a constant demand
(ii) Maximum constant maintainable demand from a given storage
- Discuss the positive and negative impacts on environment due to river valley projects.