Despite the government's ambitious targets, rooftop solar installations in India are hindered by multiple factors. Elaborate. How far do you think that PM Surya Ghar Yojana can incentivise the adoption of rooftop solar installations?
Vibhor Bhardwaj, AIR 19, 2024
Solar power installed capacity of India till March 2024 is around 84 GW which is around 16% of total installed capacity.
Factors hindering growth of rooftop solar installation
1. Financial factors: - High initial cost of installation. - Poor and unmarginalized -> not affordable. - Electricity theft deterring the adoption in villages. 2. Technical factors: - Skilled manpower to bridge technical gap is missing. - Inadequate private support. 3. Subsidized scheme came Late in comparison to mounted solar panels -> PM KUSUM and Mega Solar Parks. 4. The import tariffs on raw material like Photovoltaic panels, cells etc.
PM: Surya Ghar Yojana
- 300 unit free per month - mobilize 1 Cr Households for solar rooftops.
Advantages
1. Target: The scheme targets the household not the capacity, so it is better equipped. 2. Subsidy provision for 1 kW, 2 kW and 3 kW is tailored approach. So that the different demands can be met. (DEMAND BASED, Not Supply based) 3. Rural areas as well as Urban area targeting with lucrative installation incentives. (₹60,000/- on 1KW connection) 4. Smart metres allowing selling of surplus power.
However, there are still challenges such as.
1. Cost is still high. 2. Rural penetration is challenging. 3. The import tariffs are still not lowered deterring the manufacturers for production. 4. The plastic waste generated management is a challenge.
Hence, the scheme takes India a step ahead in achieving 50% renewable share by 2030 as per Panchamrita and Net Zero by 2070.